Valard works with mining companies to bring energy projects to life

Project showcases Valard’s engineering excellence.
homepage-header6a-opt-1600x800-1-1600x800

Throughout history, significant technological advancements have helped humanity overcome challenges, driving progress across industries and communities.

The Côté Gold High Voltage Substation Project, executed by the Valard Construction Substation Team, exemplifies this progress. Completed in August 2023 for IAMGOLD and Wood PLC, the project showcases engineering excellence in electric power infrastructure. At its core is a 115kV interconnect substation and a Static VAR Compensator (SVC) yard, featuring a revolutionary Synchronous Condenser system from Hitachi. This advanced technology enhances power stability and reliability, ensuring seamless operations for years to come.

Located in a remote area—an hour and forty-five minutes from Timmins and two hours from Sudbury—the construction site posed logistical challenges. Despite this, the Valard Substation Team remained dedicated to safety and environmental responsibility. Their approach resulted in an outstanding safety record: zero lost time injuries, zero high-potential near misses, and zero environmental incidents. 

This achievement reinforces Valard’s reputation for delivering high-quality, safe, and environmentally responsible projects while setting a new industry standard. The Côté Gold High Voltage Substation Project demonstrates what can be achieved through precision and planning. More than just a completed build, the project reflects technical expertise and steady progress, proving that even the most complex challenges can be managed with the right team and a clear vision for the future.

image-3

Project Highlights:

  • Four 115kV breakers: Ensuring robust and reliable power distribution.
  • Modern Control Building: Equipped with state-of-the-art control technology.
  • Two transformers and two station service transformers: Enhancing power management capabilities.
  • Two Synchronous Condensers: A key component for operational efficiency.
  • Top-tier SVC Yard equipment: Improving power infrastructure standards.